Station management pays special attention to the radiological protection of workers on-site by constantly monitoring the effects of radiation on individuals (ie. dose). At the turn of the 21st century, typical top-quartile world performance in collective dosage of a nuclear power station similar to Daya Bay is within 560 man.mSv in a year, and typical median performance is within 1100 man.mSv per year.

It should be noted that all of us are exposed to radiation all the time, with a typical individual dose in Hong Kong of over 3 mSv per year, most of which is from natural radiation sources.

Station management is committed to:

   observe the statutory dose limits for individuals as stated in China's national regulations and

   keep the collective dose as low as reasonably achievable

[ 2015年12月 ] Maximum Daily Individual
Dose

- 0.09(毫希)
Collective Dose Power Station
Staff
 - 13* man. mSv
Collective Dose Contractors
On Site
- *(人.毫希)
Maximum Daily Individual Dose
It refers to the highest daily dosage of radiation record of an individual worker during the period. The amount of daily dosage received by other workers or this particular worker on any other days was less than this figure.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Collective Dose Power Station Staff & Collective Dose Contractors On Site
The total amount of radiation received (or absorbed) by the workers employed by the power station and contractors on site for the month.
Notes: Planned refuelling and overhaul activities were carried out during mid December in the previous year to the beginning of July 1995, and late December 1995 to early April, next year. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during late December in the previous year to late May 1996, and late December 1996 to late February, next year. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during late December in the previous year to late February 1997, mid March to early May 1997, and late November 1997 to mid January, next year. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during late November in the previous year to mid January 1998, late January to mid March 1998, and late November 1998 to early January, next year. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during late November in the previous year to the beginning of January 1999, late January to mid March 1999, and mid November to the beginning of January, next year. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during mid January to late February, and late November to late December, 2000. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during mid January to late February, 2001, and early December 2001 to early January, next year. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during early December in the previous year to early January, 2002, and late January to the end of February, 2002. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during late January to mid March, and late March to late April, 2003. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during late April to late July, and end of September to early November, 2004. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during late September to early December, 2005. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during early March to mid May, 2006. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during late April to the end of May, and mid October to mid November, 2007. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out in November 2008. This results in the relatively high level of collective radiation dosage during the period, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during mid April to mid May, 2009. This results in the relatively high level of collective radiation dosage during the period, but the level is still well within the safety limit.

Notes: Planned refuelling and overhaul activities were carried out during late April to mid May, and late October to end of November, 2010. This results in the relatively high level of collective radiation dosage during the periods, but the level is still well within the safety limit.

"Notes:

A higher collective radiation dosage was recorded in June 2011 because of maintenance work at a ventilation system, but remained within limits.

A higher collective radiation dosage was recorded in August 2011 with modification of service equipment conducted, but remained within limits.

As outage for planned refuelling and overhaul was carried out in Unit 2 in October to December 2011, a relatively higher level of radiation dosage received by the staff was recorded during the period, and the level is still well within the statutory limit."

Notes:

As outage for planned refuelling and overhaul was carried out at Unit 1 in April and May 2012, a relatively higher level of radiation dosage received by the staff was recorded during the period, and the level is still within statutory limits.

Notes:

As outage for planned refuelling and overhaul was carried out at Unit 2 in April and May 2013, a relatively higher level of radiation dosage received by the workers was recorded during the period, and the level is still within statutory limits.

As outage for planned refuelling and overhaul was carried out at Unit 1 in October and November 2013, a relatively higher level of radiation dosage received by the workers was recorded during the period, and the level is still within statutory limits.
* collective dose includes both power station staff and contractors

Note: As outage for planned refuelling and overhaul was carried out at Unit 2 in October to December 2014, a relatively higher level of radiation dosage received by the workers was recorded during the period, and the level is still within statutory limits.
* collective dose includes both power station staff and contractors

Note:

As outage for planned refuelling and overhaul was carried out at Unit 1 in March to May 2015, a relatively higher level of radiation dosage received by the workers was recorded during the period, and the level is still within statutory limits.
* collective dose includes both power station staff and contractors

Note:

As outage for planned refuelling and overhaul was carried out at Unit 1 in October and November 2016, a relatively higher level of radiation dosage received by the workers was recorded during the period, and the level is still within statutory limits.
* collective dose includes both power station staff and contractors

Note:

As outage for planned refuelling and overhaul was carried out at Unit 2 in October 2017, a relatively higher level of radiation dosage received by the workers was recorded during the period, and the level is still within statutory limits.
* collective dose includes both power station staff and contractors
* collective dose includes both power station staff and contractors

Maximum Daily
Individual Dose
(mSv)

Collective Dose
Power Station Staff
(man.mSv)

Collective Dose
Contractors On Site
(man.mSv)